Operations simulations

Optimize resources, keep situational awareness and make defensible decisions - production, cost, risk and safety are reported separately, never collapsed into one misleading score.

Manufacturing5 decisions

Production Bottleneck Shift

You are the shift supervisor of a packaging plant with three lines: Line A (200 units/h), Line B (140 units/h) and Line C (180 units/h). Target for the shift is 6000 units with six crew members. Production is already tight when the first problem lands on your desk. Every call you make trades production, cost, risk and safety - there are no free wins today.

Manufacturing · about 12 minutes

Water Treatment5 decisions

Water Treatment Upset

Heavy rain has pushed raw water turbidity from 3 NTU to 15 NTU, and you are the operator on duty. Your plant must keep treated water inside the permit limits all shift: turbidity below 0.3 NTU at the outlet and a chlorine residual between 0.2 and 2.0 mg/L. Dosing, filters and pumps are all yours - public health is the constraint.

Environmental / Water Resources · about 12 minutes

Advertisement