Electrical Simulation

PLC Factory

Build ladder logic rungs and watch the conveyor cell obey.

Game details & narrative
Level 1/2Score 0Streak 0Hints 0

Your shift briefing

The packaging cell has lost its program and production is waiting. The old printout shows the required behaviour, but the rungs have to be rebuilt and tested before the line can run: the conveyor starts on a sensor, stops on the e-stop, and the gate opens only when both sensors agree. Build each rung contact-by-contact, then test it against the live cell. Wrong logic gets rejected by the safety review - the way it would on a real commissioning job.

Playing as guest - your best result is stored in this browser. This is a learning simulation, not a certification.